v1.4.0 Release-Cycle: GEP Iteration and Review Phase #3824
Replies: 8 comments 19 replies
-
Could you provide more context on this note for #91?
|
Beta Was this translation helpful? Give feedback.
-
Note: we have moved forward the timeline to have |
Beta Was this translation helpful? Give feedback.
-
📣 An update for those who have GEPs moving forward in this release: We haven't had a super-official way to request extensions for timelines as the release process is still shaping up. However, we recognize that we need something. If you need an extension, these are our guidelines (so far) based on the Kubernetes process:
(note that in the future we're going to try and iterate and improve on this, as well as the whole release process based on what we learn during each one). So if you need an extension, please create a comment here on this discussion with the request and let us know. |
Beta Was this translation helpful? Give feedback.
-
Request for timeline extension for: #3760 (comment) |
Beta Was this translation helpful? Give feedback.
-
I'd like an extension for Default Gateways until the end of the week. I expect to have resolved all the comments today, but I want to give folks adequate time to review before it merges. |
Beta Was this translation helpful? Give feedback.
-
I'm going to preemptively request a special dispensation here too: although I don't think it's realistic to really get Off-Cluster Gateways into 1.4, I would really like to get the Mesh resource in. I'll work with @karthikbox here to get a minimal definiton GEP for Mesh in tomorrow. |
Beta Was this translation helpful? Give feedback.
-
I'd like a week-long extension for E/W authz GEP until 29th July. Based on recent useful feedback and comments (some of which were not on GH), I expect to work with other folks this week to figure out if and how we want to change the API details to be able to merge a good-enough experimental API. |
Beta Was this translation helpful? Give feedback.
-
Thank you everyone for your time and efforts on this part of the release cycle. The GEP Iteration and Review part of the cycle has completed, and we're now on to implementations on our way to code freeze on August 22nd. |
Beta Was this translation helpful? Give feedback.
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
IMPORTANT: The GEP Iteration and Review cycle for
v1.4.0
has ended, and this thread is closedThe scoping phase for standard and experimental channels for v1.4.0 has concluded.
The following standard features are accepted for the release:
As for experimental, we currently have capacity for 4 regular issues, and 2 issues that support the transition from ingress to Gateway API based on the current experimental pipeline. These experimental features are accepted:
Normal Pipeline (max 4):
GEP: Support E/W authorization #3779- Missed Implementable deadline and extension. Out of scope for this release.GEP: Support ClientIp based session persistence #3798- Missed Implementable deadline. Out of scope for this release.GEP: Off-Cluster Gateways #3792- Extension to pull the Mesh resource out of this GEP for inclusion in v1.4.Ingress Pipeline (max 2):
The following timeline shows the expectations for the experimental feature transitions:
June 10GEP PR with "What?"/"Why?"/"Who?" is ready for review✔️June 17GEP PR with "What?"/"Why?"/"Who?" is merged✔️July 1GEP PR with proposed API details (the "How?") is ready for review✔️July 22GEP PR with final API details is merged in implementable state✔️After this, then final implementations will be be due in time for code freeze on August 26th. See the milestone for more details after the GEP iterations and review cycle.
The timeline for standard features will be done a little different and communicated uniquely for each issue. Expect updates and check-ins on each individual feature during this phase, and if you have any questions, concerns or need support please reach out!
Beta Was this translation helpful? Give feedback.