chore: Add per-test hang timeout. #59
Annotations
3 errors
|
build-and-test (ubuntu-latest, netstandard2.0, net8.0)
Process completed with exit code 1.
|
|
build-and-test (windows-latest, net462, net462)
The strategy configuration was canceled because "build-and-test.ubuntu-latest_netstandard" failed
|
|
build-and-test (windows-latest, net462, net462)
The operation was canceled.
|