chore: Use gh-actions/actions/persistent-stores #231
ci.yml
on: pull_request
build-docs
47s
build-windows
2m 32s
Matrix: build-linux
Annotations
4 errors
|
build-linux (3.2) / build-gem
Process completed with exit code 1.
|
|
build-linux (jruby-9.4) / build-gem
The operation was canceled.
|
|
build-linux (jruby-9.4) / build-gem
The strategy configuration was canceled because "build-linux._3_2" failed
|
|
Run CI
The strategy configuration was canceled because "build-linux._3_2" failed
|