Skip to content

odhcp6c: update to Git HEAD (2025-12-17) #4438

odhcp6c: update to Git HEAD (2025-12-17)

odhcp6c: update to Git HEAD (2025-12-17) #4438

Triggered via push December 17, 2025 22:35
Status Failure
Total duration 10h 18m 47s
Artifacts

packages.yml

on: push
Build all core packages for selected target  /  ...  /  Determine Changed Files
8s
Build all core packages for selected target / Determine Changed Files / Determine Changed Files
Build all core packages for selected target  /  ...  /  Determine Changed Packages
9s
Build all core packages for selected target / Determine Changed Packages / Determine Changed Packages
Matrix: Build all core packages for selected target / Build Packages with external toolchain
Matrix: Build all core packages for selected target / Upload ccache cache to s3
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 3 warnings
Build all core packages for selected target / Build Packages with external toolchain (malta, be) / Build malta/be
Docker pull failed with exit code 1, back off 7.83 seconds before retry.
Build all core packages for selected target / Build Packages with external toolchain (malta, be) / Build malta/be
Docker pull failed with exit code 1, back off 8.092 seconds before retry.
Build all core packages for selected target / Build Packages with external toolchain (x86, 64) / Build x86/64
No files were found with the provided path: openwrt/logs. No artifacts will be uploaded.