Skip to content

Docker Hub

Docker Hub #916

Triggered via schedule March 23, 2025 00:52
Status Failure
Total duration 31s
Artifacts

dockerhub.yml

on: schedule
Matrix: pull
Fit to window
Zoom out
Zoom in

Annotations

5 errors
pull (linux/amd64, latest)
Process completed with exit code 10.
pull (linux/arm64, latest)
The operation was canceled.
pull (linux/arm64, latest)
The strategy configuration was canceled because "pull.linux_amd64_latest" failed
pull (linux/amd64, main)
The operation was canceled.
pull (linux/amd64, main)
The strategy configuration was canceled because "pull.linux_amd64_latest" failed