Skip to content

chore(deps): update dependency sphinx to v9 #1891

chore(deps): update dependency sphinx to v9

chore(deps): update dependency sphinx to v9 #1891

Triggered via pull request December 16, 2025 05:07
Status Failure
Total duration 33s
Artifacts

auto-testing.yml

on: pull_request
Matrix: build
Matrix: check-import
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.10)
Process completed with exit code 1.
build (3.12)
The strategy configuration was canceled because "build._3_10" failed
build (3.12)
The operation was canceled.
build (3.14)
The strategy configuration was canceled because "build._3_10" failed
build (3.14)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_10" failed
build (3.13)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_10" failed
build (3.11)
The operation was canceled.