Skip to content

chore(deps): bump github/codeql-action from 3 to 4 (#437) #1850

chore(deps): bump github/codeql-action from 3 to 4 (#437)

chore(deps): bump github/codeql-action from 3 to 4 (#437) #1850

Triggered via push November 1, 2025 09:00
Status Cancelled
Total duration 24s
Artifacts

dotnet.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubuntu-24.04-arm)
Canceling since a higher priority waiting request for dotnet-refs/heads/master-1 exists
build (ubuntu-24.04-arm)
The operation was canceled.
build (macos-latest)
Canceling since a higher priority waiting request for dotnet-refs/heads/master-1 exists
build (macos-latest)
The operation was canceled.
build (ubuntu-latest)
Canceling since a higher priority waiting request for dotnet-refs/heads/master-1 exists
build (ubuntu-latest)
The operation was canceled.
dotnet
Canceling since a higher priority waiting request for dotnet-refs/heads/master-1 exists