Skip to content

feat: driver refactor & cache integration #279

feat: driver refactor & cache integration

feat: driver refactor & cache integration #279

Triggered via pull request August 4, 2025 04:51
@cofincofin
synchronize #44
benchmark-tool
Status Failure
Total duration 2m 12s
Artifacts

ci.yml

on: pull_request
Matrix: test-linux
build-docs
20s
build-docs
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test-linux (3.11)
Process completed with exit code 1.
test-linux (3.10)
The operation was canceled.
test-linux (3.10)
The strategy configuration was canceled because "test-linux._3_11" failed
test-linux (3.12)
The operation was canceled.
test-linux (3.12)
The strategy configuration was canceled because "test-linux._3_11" failed
test-linux (3.9)
The operation was canceled.
test-linux (3.9)
The strategy configuration was canceled because "test-linux._3_11" failed
test-linux (3.13)
The operation was canceled.
test-linux (3.13)
The strategy configuration was canceled because "test-linux._3_11" failed