Skip to content

chore(release): bump to v0.38.1 (#334) #1416

chore(release): bump to v0.38.1 (#334)

chore(release): bump to v0.38.1 (#334) #1416

Triggered via push January 21, 2026 22:01
Status Failure
Total duration 1m 28s
Artifacts

ci.yml

on: push
Matrix: test-linux
build-docs
0s
build-docs
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test-linux (3.12)
Process completed with exit code 2.
test-linux (3.14)
The strategy configuration was canceled because "test-linux._3_12" failed
test-linux (3.14)
Process completed with exit code 2.
test-linux (3.13)
The strategy configuration was canceled because "test-linux._3_12" failed
test-linux (3.13)
Process completed with exit code 2.
test-linux (3.10)
The strategy configuration was canceled because "test-linux._3_12" failed
test-linux (3.10)
The operation was canceled.
test-linux (3.11)
The strategy configuration was canceled because "test-linux._3_12" failed
test-linux (3.11)
The operation was canceled.