feat(perf)!: parsing performance improvements #1465
ci.yml
on: pull_request
validate
25s
Matrix: test-linux
build-docs
50s
Annotations
18 errors
|
pyright
Process completed with exit code 1.
|
|
test-linux (3.13)
Process completed with exit code 1.
|
|
test-linux (3.13)
Event loop is closed
|
|
test-linux (3.13)
Event loop is closed
|
|
test-linux (3.13)
Event loop is closed
|
|
test-linux (3.13)
Event loop is closed
|
|
test-linux (3.13)
Event loop is closed
|
|
test-linux (3.13)
Event loop is closed
|
|
test-linux (3.13)
Event loop is closed
|
|
test-linux (3.13)
Event loop is closed
|
|
test-linux (3.12)
The strategy configuration was canceled because "test-linux._3_13" failed
|
|
test-linux (3.12)
The operation was canceled.
|
|
test-linux (3.10)
The strategy configuration was canceled because "test-linux._3_13" failed
|
|
test-linux (3.10)
The operation was canceled.
|
|
test-linux (3.11)
The strategy configuration was canceled because "test-linux._3_13" failed
|
|
test-linux (3.11)
The operation was canceled.
|
|
test-linux (3.14)
The strategy configuration was canceled because "test-linux._3_13" failed
|
|
test-linux (3.14)
The operation was canceled.
|