fix(deps): update dependency mime to v4 #276
continuous-integration.yaml
on: pull_request
Code Lint
15s
Commit Lint
17s
Matrix: build
Annotations
5 errors
|
build (20)
Process completed with exit code 1.
|
|
build (24)
The strategy configuration was canceled because "build._20" failed
|
|
build (24)
Process completed with exit code 1.
|
|
build (22)
The strategy configuration was canceled because "build._20" failed
|
|
build (22)
Process completed with exit code 1.
|