Skip to content

Commit a9a475b

Browse files
authored
Updated Analytics page (#325)
1 parent 7047dd9 commit a9a475b

File tree

2 files changed

+45
-43
lines changed

2 files changed

+45
-43
lines changed

docs/core-concepts/analytics.mdx

Lines changed: 44 additions & 40 deletions
Original file line numberDiff line numberDiff line change
@@ -5,71 +5,75 @@ description: Visualize work item data, track team capacity, measure progress, an
55

66
# Analytics
77

8-
Imagine transforming your entire Workspace data into a structured dataset that provides actionable insights, enhancing your understanding of your work. Plane Analytics does just that, acting as your personal analyst. It swiftly answers your queries, forecasts demand, and determines scope within moments. Dive into data with Plane Analytics and make smarter decisions.
8+
Transform your entire workspace data into actionable insights with Analytics. Get instant answers to complex questions, forecast demand, track progress across all dimensions, and make data-driven decisions with confidence.
99

10-
![Snapshot of Plane Analytics in Action](https://media.docs.plane.so/analytics/analytics-custom-analytics.webp#center)
10+
![Analytics Overview](https://media.docs.plane.so/analytics/analytics-overview.webp#center)
1111

12-
## Analytics Levels
12+
The enhanced visualization experience brings your data to life with interactive charts featuring hover details and tooltips that provide instant context as you explore your metrics.
1313

14-
Plane Analytics can be utilized at two distinct levels:
14+
## Analytics access levels
1515

16-
* **Workspace Level:** Users in the **`Owner`** or **`Admin`** roles have access to Plane Analytics at the Workspace level. You can locate it on the left sidebar, just beneath your Dashboard.
17-
* **Project Level:** Users assigned the **`Owner`**, **`Admin`**, or **`Member`** roles can avail Plane Analytics at the Project level. To utilize this feature within a Project, navigate to your respective Project Work items, and you'll find it on the top bar, adjacent to the **`Views`** section.
18-
* **Cycle and Module Level**: Operating within the Project Level, Plane Analytics efficiently filters work items specific to a given Cycle or Module, subsequently generating pertinent insights. To access this, navigate to Cycle/Module and hit Plane Analytics on the top bar.
16+
Plane Analytics operates at multiple levels to provide the right insights:
1917

20-
## Analytics types
21-
Upon entering Plane Analytics, you'll encounter two distinct tabs:
18+
* **Workspace level**
19+
Users in the `Admin` roles have access to Analytics at the Workspace level. You can locate it on the left sidebar.
20+
21+
* **Project level**
22+
Users with `Admin`, or `Member` roles can access project-specific analytics. Navigate to your project and find Analytics in the top navigation bar.
2223

23-
1. Scope and Demand
24-
2. Custom Analytics
24+
* **Cycle and Module level**
25+
Drill down into specific cycles or modules for focused insights. Access through the respective Cycle or Module views with Analytics in the top bar.
2526

26-
Let's dive into what these entail.
27+
## Analytics types
28+
The new analytics experience provides comprehensive views across six key areas:
2729

28-
### **Scope and Demand**
30+
### Overview
31+
Get a bird's-eye view of your entire workspace with essential performance indicators that drive strategic decision-making. The workspace metrics section displays comprehensive user statistics including total users, admins, members, and guests, alongside project count and distribution across your organization. You can monitor the overall work item count across all projects and track active cycles and intake statistics to understand your team's current workload.
2932

30-
This tab showcases a pre-designed dashboard focused on Scope and Demand. Functional at both Workspace and Project Levels, this dashboard offers a snapshot of all work items and their progress, calculated based on the states of the work items.
31-
![Scope and demand](https://media.docs.plane.so/analytics/analytics-scope-demand.webp#center)
33+
### Projects analysis
3234

33-
#### Demand
35+
The project status tracking features provide a complete breakdown of your total project count with comprehensive status analysis, enabling you to quickly identify on-track, off-track, and at-risk projects. Visual charts display project distribution by current state, whether in draft, execution, or other phases, helping you understand your project pipeline at a glance.
3436

35-
**Open Tasks**: This encompasses the total number of tasks listed under the **`Backlog`**, **`Unstarted`**, and **`Started`** states.
37+
### Work items analysis
38+
![Analytics Work Items](https://media.docs.plane.so/analytics/work-item-analytics.webp#center)
3639

37-
At the Workspace level, it aggregates all open tasks from all Projects within the Workspace. On the other hand, at the Project level, it solely counts the work items present within the specified project.
40+
The work item metrics section displays total work items with state-based breakdown, showing started, backlog, unstarted, and completed counts to give you a complete picture of your team's workload distribution. The created vs resolved trend analysis tracks progress over time, while velocity and completion rate tracking helps you understand team performance patterns.
3841

39-
#### Scope
42+
#### Customized insights
43+
![Customized insights](https://media.docs.plane.so/analytics/customized-insights.webp#center)
4044

41-
Scope provides a summary of your team's bandwidth. Here, you'll find the total number of **`Backlog`**, **`Unstarted`**, and **`Started`** work items assigned to each member of your Workspace or Project.
45+
The interactive chart builder offers flexible measure options including work item count and estimate points, allowing you to focus on the metrics that matter most to your team. Dimension analysis capabilities cover state name, state group, priority, label, assignee, estimate point, and cycle, providing multiple perspectives on your data.
4246

43-
This feature allows you to swiftly understand who has more work items assigned, and who has the bandwidth to tackle additional work items. For customization by different groups, use the Custom Analytics.
47+
The priority section delivers a comprehensive breakdown by priority levels including high, medium, low, urgent, and none categories.
4448

45-
Directly beneath the Scope and Demand section, you'll find couple of Leaderboards for celebration 🎉. These display the top performers in work item closure, as well as notable contributors to work item initiation. To cap it all off, a comprehensive graph illustrates the total number of work items closed throughout the entire year.
49+
You can easily export all your analytics data to CSV format, making it simple to dive deeper into the numbers using spreadsheets or other analysis tools you prefer.
4650

47-
### Custom Analytics
51+
### Cycles analysis
52+
![Analytics Cycles](https://media.docs.plane.so/analytics/cycle-analytics.webp#center)
4853

49-
Welcome to the realm of Bar charts.
54+
The cycle metrics section provides total cycle count with comprehensive status breakdown, tracking current, upcoming, and completed cycles to help you manage your sprint planning effectively. Cycle progress visualization displays completion percentages and performance indicators to keep teams aligned on sprint goals.
5055

51-
Custom Analytics is the hub of answers pertaining to your work. Here, we will guide you on how to leverage it to its fullest potential.
56+
Progress tracking includes sophisticated scatter plot analysis showing cycle completion rates across different time periods, individual cycle performance data with lead and project information for accountability, and comprehensive start and end date tracking with completion percentages.
5257

53-
Upon accessing Custom Analytics, three distinct properties will greet you - **`Measure`**, **`Dimension`**, and **`Group`**.
58+
### Modules analysis
59+
![Analytics Modules](https://media.docs.plane.so/analytics/module-analytics.webp#center)
5460

55-
**Measure:** The foundation of Plane is built upon Work items, and the Measure property echoes this centrality. This property consists of two attributes: **`Work item Count`** and **`Estimate`**. These attributes form the Y-axis of your chart.
61+
The module overview section displays total module count across all projects with detailed status distribution covering completed, in progress, planned, and paused modules. Module progress visualization includes scatter plots with completion percentages to help you understand development velocity and identify potential delays.
5662

57-
**Dimension:** This property is where you can utilize all the work item properties to derive insights based on the chosen Measure. The following attributes are currently supported:
63+
Individual module tracking provides detailed information including lead assignment and responsibility mapping, project-wise module distribution for cross-project visibility, and progress percentage analysis with timeline tracking.
5864

59-
* State name
60-
* State group
61-
* Priority
62-
* Label
63-
* Assignee
64-
* Estimate point
65-
* Cycle
65+
### Intake analysis
66+
![Analytics Intake](https://media.docs.plane.so/analytics/Intake-analytics.webp#center)
6667

67-
Each attribute in the Dimension property aids in understanding the Measure property from a different perspective, offering detailed analysis based on the selected attribute.
68+
The intake metrics section tracks total intake items with status breakdown, monitoring accepted, declined, and duplicate requests to help you understand demand patterns.
6869

69-
**Group:** The Group property enables you to delve deeper into your insights by constructing stacked bar charts. It's important to note that although the same attributes are sourced from the Dimension property, any selected attribute in the Group property will disappear from the Dimension property. This offers a way to further categorize and understand the data in your Dimension attribute, creating a more layered insight into your work.
70+
Trend analysis capabilities include historical intake pattern recognition that reveals seasonal variations and cyclical demand, acceptance rate monitoring to understand how well requests align with team capacity, and project-wise intake distribution analysis.
7071

71-
## Export Analytics
72+
## Export analytics
7273

73-
For backup purposes and further analysis, data from Plane Analytics can be effortlessly exported into a CSV format with a single click. The CSV data will then be shared with the specified user.
74+
You can export comprehensive data from every analytics view with our CSV export functionality, giving you the flexibility to perform deeper analysis using your preferred external tools. The export process is designed for simplicity with one-click data downloads that include detailed datasets containing all relevant metrics and dimensions from your selected view.
7475

75-
Please note that only users with **`Owner`** or **`Admin`** roles in a workspace can access these exports.
76+
Access to export functionality is carefully controlled and available only to users with an Admin role, ensuring your sensitive project data remains secure.
77+
78+
---
79+
Analytics transforms raw data into strategic insights, helping you optimize team performance, predict bottlenecks, and drive successful project outcomes.

docs/core-concepts/projects/overview.mdx

Lines changed: 1 addition & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -40,7 +40,7 @@ Once they're in the workspace, you can invite them to join the project and assig
4040

4141
If you want to make sure every work item gets assigned, you can set a **Default assignee** for when work items are created without one. This ensures nothing slips through the cracks.
4242

43-
![Project members](https://media.docs.plane.so/projects/project-members.webp#center)
43+
![Project members and teamspaces](https://media.docs.plane.so/projects/project-members-teamspaces.webp#center)
4444

4545
### How users join projects
4646

@@ -52,8 +52,6 @@ Users can become project members in two different ways, and understanding both h
5252

5353
Users can have both types of access simultaneously. When this happens, Plane automatically applies whichever role gives them higher permissions. For example, if someone is a `Guest` on your project but joins a linked teamspace, they're automatically upgraded to `Member` access. If they're already an `Admin`, they keep their `Admin` role.
5454

55-
The project members list shows everyone who has access to your project, regardless of how they gained that access, so you can see your complete team in one place.
56-
5755
## Enable features
5856

5957
After creating a project, you can turn on specific features based on your requirements:

0 commit comments

Comments
 (0)