Skip to content

Update subproject reference and add layout component for design system #1817

Update subproject reference and add layout component for design system

Update subproject reference and add layout component for design system #1817

Triggered via push April 24, 2025 04:38
Status Failure
Total duration 34s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (22, ubuntu-latest)
Process completed with exit code 1.
test (22, macos-latest)
The operation was canceled.
test (22, macos-latest)
The strategy configuration was canceled because "test._22_ubuntu-latest" failed
test (22, windows-latest)
The operation was canceled.
test (22, windows-latest)
The strategy configuration was canceled because "test._22_ubuntu-latest" failed