Skip to content

Bump astral-sh/setup-uv from 5 to 6 #747

Bump astral-sh/setup-uv from 5 to 6

Bump astral-sh/setup-uv from 5 to 6 #747

Triggered via pull request April 25, 2025 00:17
Status Success
Total duration 1m 20s
Artifacts

codeql-analysis.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

2 warnings
CodeQL-Build
1 issue was detected with this workflow: git checkout HEAD^2 is no longer necessary. Please remove this step as Code Scanning recommends analyzing the merge commit for best results.
CodeQL-Build
Unable to validate code scanning workflow: CheckoutWrongHead