How to run to sub-daily level #134
Unanswered
fmanquehual
asked this question in
Q&A
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
-
Hello! I hope you are very well.
I want to run mHM at a time-step of 3 hours. I have set a time-step to 3 in 'mhm.nml' and prepare the data to that time-steps, as following:
But mHM give me the next message:
! ###################################
...
Done 8 time steps.
Finished at 22.09.2025 08:56:35.
mHM: Finished!
MPI finished 0 2
Reading lcover for domain: 1 ...
Tillage layers: the tillage horizons are modelled
upto mHM layers: 3
Reading data for domain: 1 ...
Reading slope ...
Reading aspect ...
Reading soil ids ...
Reading LAI ...
Reading latitude/logitude ...
in 0.567 seconds.
in 0.679 seconds.
in 0.679 seconds.
Initialize domains ...
in 0.681 seconds.
Reading data for domain: 1 ...
Finished Initialization of mRM
Read forcing and optional data ...
read meteo weights for tavg ...
read meteo weights for pet ...
read meteo weights for pre ...
Reading meteorological forcings for Domain: 1 ...
read precipitation ...
***ERROR: time_steps are not equal over all times in file and/or do not conform to requested timestep in file (cachapoal_alto_doctorado/input/meteo/pre/pre.nc)
STOP 1
! ###################################
Attached a zip with the data:
data_mhm_subhourly.zip
Beta Was this translation helpful? Give feedback.
All reactions