Version: 2.0 Last Updated: 2025-11-02 Purpose: How to work with ScopeLock for predictable, verifiable delivery


What ScopeLock Means for You

Simple version: We lock the scope, deliver against tests, and you pay only when those tests pass.

What this eliminates:

  • "Is it done?" ambiguity
  • Scope creep without clear choices
  • Paying for broken work
  • Wondering if you got what you paid for

What this gives you:

  • Executable acceptance criteria (tests that prove it works)
  • Evidence Sprints (see progress in ≤90s demos)
  • Proof Log (public record of every milestone)
  • Clear change control (know the price before committing)

The Process (Your Journey)

Phase 1: ScopeLock

What happens: We co-write a document called AC.md (Acceptance Criteria) together. This is not a vague proposal — it's an executable contract.

What's in AC.md:

  1. Functional criteria — What the system does
  2. Non-functional criteria — Performance (p95 latency), quality thresholds
  3. Verification — The exact tests that must pass + seed data to run them

Your role:

  • Tell us what you need (we'll ask clarifying questions)
  • Review and approve the criteria
  • Sign off when you're confident we understand

Our role:

  • Listen and ask the right questions
  • Write testable, measurable criteria
  • Show you examples from past projects
  • Freeze the baseline with a git tag

When this phase ends:

  • You see a ac-baseline_<milestone>_<date> tag
  • Scope is locked
  • Price is locked
  • We begin building

Time investment: Usually 2-4 hours total (1-2 calls + async review)


Phase 2: Evidence Sprint

What happens: We build a minimal working version and show you quantified progress.

What you receive:

  1. Demo — A working URL you can click through (≤90 seconds to see the value)
  2. Delta — Quantified improvements (before → after numbers)

Example delta:

Signup flow p95: 1200ms → 280ms (↓77%)
Steps to complete: 7 → 3 (↓57%)
Auth method: Email+password → OTP (passwordless)

Your role:

  • Test the demo
  • Give feedback
  • Confirm we're on the right track

Our role:

  • Build fast, show working software early
  • Measure and report real deltas
  • Adjust based on your feedback

When this phase ends:

  • You see a evidence-sprint_<milestone>_<date> tag
  • Demo is live
  • /proof page published with demo + delta

Time investment: 30-60 minutes to test and review


Phase 3: Build to AC Green

What happens: We finish building and run all the acceptance tests specified in AC.md.

What you see:

  • CI pipeline running tests
  • Performance metrics meeting thresholds
  • All criteria going green

Your role:

  • Observe progress (we'll share links)
  • Test the final system
  • Confirm acceptance criteria are met

Our role:

  • Implement all features
  • Pass all tests
  • Meet all performance thresholds
  • Get quality review (no silent failures)

When this phase ends:

  • You see a ac-green_<milestone>_<date> tag
  • All tests pass
  • /proof entry updated
  • Invoice issued

Payment trigger: AC green = invoice. You pay only when tests pass.

Time investment: 1-2 hours for final review and sign-off


Phase 4: Proof Log

What happens: Every milestone, demo, delta, and change is published to /proof as a permanent record.

What you can do:

  • See the full history of what we delivered
  • Share proof with stakeholders
  • Reference deltas for internal reporting

Example proof page:

evidence-sprint_signup-otp_2025-11-02
  ✓ Demo: [link] (65 seconds)
  ✓ Delta: p95 ↓77%, steps ↓57%
  ✓ AC: /proof/AC.md
  ✓ Status: Delivered

ac-green_signup-otp_2025-11-05
  ✓ All tests passed
  ✓ Invoice: #2025-11-001
  ✓ Status: Paid

Change Control (What If I Need Something Different?)

Reality: Scope changes. We expect it. Here's how we handle it without drama.

Option 1: Swap (€0, same milestone)

When to use:

  • You want to replace a feature with something else
  • The new thing is equal or simpler complexity
  • Same timeline

Example: "Instead of email notifications, I want SMS notifications."

Process:

  1. You tell Rafael what you want to swap
  2. Aïcha sizes the complexity (equal/lower = Swap)
  3. We update AC.md
  4. Same price, same timeline

Cost: €0 (built into original milestone)


Option 2: Add (new milestone, priced)

When to use:

  • You want additional features beyond original scope
  • The change increases complexity
  • New functionality

Example: "I also want push notifications and a mobile app."

Process:

  1. You tell Rafael what you want to add
  2. Aïcha sizes and defines new milestone
  3. Rafael prices it
  4. You decide: accept (new milestone) or decline
  5. If accepted: new AC.md, new Evidence Sprint, new AC green

Cost: Priced based on complexity (you approve before we start)


Proof for Changes

Every change request gets its own /proof entry showing:

  • Original request
  • Swap or Add decision
  • Updated criteria (if Swap)
  • New demo + delta
  • Status (pending → accepted → delivered)

FAQs

When do I pay?

At AC green. When acceptance tests pass and you've verified the system works. Not before.

What if tests fail at delivery?

We don't invoice. Our risk, not yours. We fix until green or refund any deposit.

Can I see progress before it's done?

Yes. Evidence Sprint shows working demo early. You're not waiting in the dark.

How do I know the tests are real?

You can run them. The Verification section in AC.md includes the exact command and seed data. Run it yourself.

What if I'm not technical?

We'll show you. You don't need to understand the code. We'll walk you through the demo and show you the green tests.

What if I need changes after AC green?

Same process. Open a new CR (Swap or Add). Evidence Sprint → AC green → pay.

How long does each phase take?

Typical timeline:

  • ScopeLock: 2-4 hours (1-2 days elapsed)
  • Evidence Sprint: 2-5 days
  • AC green: 1-2 weeks total
  • Simple projects: faster
  • Complex projects: longer, but always visible progress

Can I cancel mid-project?

Yes. If you've paid a deposit, you keep all code and documentation produced so far. No further obligation.

Do you offer support after delivery?

2 weeks included. Adjustments and bug fixes within 2 weeks of AC green are included. After that, we can discuss retainer or hourly support.

What if we disagree on whether AC is met?

Tests decide. That's why we write executable criteria. If tests pass, AC is met. If they don't, it's not. No ambiguity.


What You Should Expect from Us

Communication:

  • Clear status updates via SYNC.md
  • Links to tags, demos, proof pages
  • Honest about blockers
  • No fluff, no theatre

Delivery:

  • Working software over documentation
  • Tests that prove it works
  • Quantified deltas (not adjectives)
  • Public proof you can share

Change handling:

  • Clear Swap/Add decision within 24 hours
  • Pricing before commitment
  • Same quality bar regardless

Quality:

  • No silent fallbacks (fail-loud)
  • Performance meets stated thresholds
  • Security reviewed
  • Code you can maintain

What We Expect from You

During ScopeLock:

  • Answer clarifying questions
  • Review AC.md carefully
  • Sign off when satisfied

During Evidence Sprint:

  • Test the demo (30-60 min)
  • Give specific feedback
  • Tell us if we're off track

During Build:

  • Be available for questions (async is fine)
  • Review at checkpoints
  • Final sign-off at AC green

For Changes:

  • Be clear about what you want
  • Decide on Swap/Add options
  • Accept that scope changes may affect timeline

Overall:

  • Trust the process
  • Judge us by artefacts (demos, deltas, tests)
  • Communicate blockers early

Getting Started

Step 1: Reach out to Rafael with your need

Step 2: Schedule a ScopeLock call (1 hour)

Step 3: Review draft AC.md (async)

Step 4: Approve baseline (we begin immediately)

Step 5: See Evidence Sprint demo (2-5 days later)

Step 6: Receive AC green + invoice (1-2 weeks total)

Step 7: Pay and use your working system

Step 8: View proof at /proof/<milestone>


Contact

Client Relations: Rafael Moretti Status & CRs: Check SYNC.md or /proof General: hello@scopelock.dev (if available)


Summary

ScopeLock is a contract you can see: executable criteria, quantified deltas, verifiable proof. You pay only when tests pass. Scope changes are handled through clear Swap/Add choices. No ambiguity. No surprises. Just working software and public proof.

Lock the scope. Prove the value.