Skip to content

Update for oracle TPC DS/H benchmarks #23

Update for oracle TPC DS/H benchmarks

Update for oracle TPC DS/H benchmarks #23

Triggered via pull request March 27, 2025 13:11
@ea-rusea-rus
synchronize #13
fix-oracle
Status Failure
Total duration 32s
Artifacts

test.yml

on: pull_request
Matrix: test
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (ubuntu-latest, 3.9)
Process completed with exit code 1.
test (windows-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
test (windows-latest, 3.10)
The operation was canceled.
test (windows-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
test (windows-latest, 3.8)
The operation was canceled.
test (ubuntu-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.8)
The operation was canceled.
test (windows-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
test (windows-latest, 3.9)
The operation was canceled.
test (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.10)
The operation was canceled.