continuous-integration #186
ci.yml
on: schedule
Build Nushell from `main`
2m 52s
Matrix: test-plugin
Annotations
9 errors
|
Test Plugin: nu_plugin_node_example
Process completed with exit code 1.
|
|
Test Plugin: nu_plugin_example
Process completed with exit code 101.
|
|
Test Plugin: nu_plugin_example
The strategy configuration was canceled because "test-plugin.nu_plugin_node_example___" failed
|
|
Test Plugin: nu_plugin_python_example
The operation was canceled.
|
|
Test Plugin: nu_plugin_python_example
The strategy configuration was canceled because "test-plugin.nu_plugin_node_example___" failed
|
|
Test Plugin: nu_plugin_nu_example
The operation was canceled.
|
|
Test Plugin: nu_plugin_nu_example
The strategy configuration was canceled because "test-plugin.nu_plugin_node_example___" failed
|
|
Test Plugin: nu_plugin_custom_values
The operation was canceled.
|
|
Test Plugin: nu_plugin_custom_values
The strategy configuration was canceled because "test-plugin.nu_plugin_node_example___" failed
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
nu
Expired
|
15 MB |
sha256:d8639ed8310c8c18a48a2a46afcfac7179c22833a7575009fd009b9d941fccea
|
|