Skip to content

continuous-integration #268

continuous-integration

continuous-integration #268

Triggered via schedule December 2, 2025 07:20
Status Failure
Total duration 3m 34s
Artifacts 1

ci.yml

on: schedule
Build Nushell from `main`
3m 11s
Build Nushell from `main`
Matrix: test-plugin
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Test Plugin: nu_plugin_example
Process completed with exit code 101.
Test Plugin: nu_plugin_node_example
The strategy configuration was canceled because "test-plugin.nu_plugin_example___targe" failed
Test Plugin: nu_plugin_node_example
Process completed with exit code 1.
Test Plugin: nu_plugin_python_example
The strategy configuration was canceled because "test-plugin.nu_plugin_example___targe" failed
Test Plugin: nu_plugin_python_example
Process completed with exit code 1.
Test Plugin: nu_plugin_custom_values
The strategy configuration was canceled because "test-plugin.nu_plugin_example___targe" failed
Test Plugin: nu_plugin_custom_values
The operation was canceled.
Test Plugin: nu_plugin_nu_example
The strategy configuration was canceled because "test-plugin.nu_plugin_example___targe" failed
Test Plugin: nu_plugin_nu_example
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
nu
15.7 MB
sha256:65a8e19ec80ba81cd14c514e9ccc9bfd60a136ccb679f10bb340a17c572d8947