-
Notifications
You must be signed in to change notification settings - Fork 41
Open
0 / 40 of 4 issues completedDescription
OCV will be carried out from Dec 8 to Dec 15th, during epoch 37.
Snapshot of ledger from 2 epochs before (35) is the one of Nov 22.
Things we'll need to do from Engineering side:
- Update OCV page to include the 4 MIPs that need to be voted on. #1626
- Add the ledger hash the week before the voting for all 4 MIPs. #1627
- Review the voting results for all 4 MIPs. #1628
- Change status of voting from "In Review" to "Completed" for all MIPs. #1629
Sub-issues
Metadata
Metadata
Assignees
Labels
No labels
Type
Projects
Status
Todo