Skip to content
goltermann edited this page Jan 29, 2016 · 11 revisions

Proposed end-of-milestone timeline

  • Feb 5 - 1.2 feature complete
    • only bugfixes, not features after this date
    • begin code slush on head, turn away features and large refactors
    • cut Alpha release candidate
  • Feb 19 - declare Beta
    • cut Beta RC and branch head to a 1.2-only branch
    • end code slush on master, open for 1.3+ work
  • Mar 7 (+2w from Beta) - release 1.2
    • this will depend on stability and bugs remaining

Key features

  • Scalability

    • More nodes
    • More pods per node
  • Wrap up features that were in flight during the 1.1 timeframe

    • Horizontal pod auto-scaling API
      • add custom metrics
    • Ingress API
    • Job API
    • DaemonSet API
    • Deployment API
    • ConfigMap API
    • Make it easier to create resources
      • Namespace generation
      • Secret/config generation
      • export and convert
Clone this wiki locally