Skip to content

EBS lab changes #75

@kgvarun

Description

@kgvarun

Introduction

  • update estimated workshop time to 70 minutes and verify sum times for all labs

lab 1

  • update objective - how to navigate to explorer
  • update side- y-side explorer sc
  • check number of sources
  • 10 mins

lab 2

  • split lab two into multiple tasks
  • add explanation to each step explanation of what the user is seeing.
  • Add apology screenshot in the end stop
  • 15 mins

lab3

  • split 1 task into multiple tasks
  • Replace cluster visualization with real data showing 289 clusters
  • 15 mins

lab4:

  • Changing title lowercase L for link command
  • Split into multiple tasks
  • 15 mins
  • Replace screenshots with actual data

lab 5

  • verify network logs are coming. You will need to cross tenancy service connector to do that
  • 15 mins

Check spelling of concluded
Update time in lab concluded
Verify references In the last lab
verify sample logs are being loaded and the timestamps in the instructions are accurate
Verify policies
Verify user doesn’t have to change to their compartment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions