Replies: 2 comments 3 replies
-
|
Things are happening in Concourse because there is a new version of a resource (or when jobs are started manually). So if you want B to run after A, then A needs to If there is no natural new version of something A produces, then you could invent something. Conceptually, I think of that as publishing an event. It could, for instance, be a new or changed file in a git repo or in an S3 bucket. But don't go there too early - usually this is a chance to discover a hidden concept that, when uncovered, improves your build architecture a lot. |
Beta Was this translation helpful? Give feedback.
-
|
Hi thanks for the message..
I agree with that and this is how I also understand.
But I found it too cumbersome to trigger a job by tinkering with an external storage or a repo
Is it possible to do that with a local file system change? Edit: It seems what I was refering as It seems there is no such thing for Jobs. Does it mean I cannot share artifact just by using the file system? |
Beta Was this translation helpful? Give feedback.
Uh oh!
There was an error while loading. Please reload this page.
-
Hello,
So I have 3 jobs, A, B and C.
Basically I want that when A pass, it triggers B and C that will run in parallel, but after A.
I saw there's a
passedoption but it's applicable when you have a ressource only (or I miss something?)Is it possible to do that?
Here is a sample pipeline:
Thanks!
Beta Was this translation helpful? Give feedback.
All reactions