Skip to content

Commit 8919a49

Browse files
dstagnoldstagnol
authored andcommitted
updating
1 parent 214ac59 commit 8919a49

File tree

1 file changed

+5
-2
lines changed
  • pages/hosted_private_cloud/hosted_private_cloud_powered_by_vmware/vmware_maintenance

1 file changed

+5
-2
lines changed

pages/hosted_private_cloud/hosted_private_cloud_powered_by_vmware/vmware_maintenance/guide.en-gb.md

Lines changed: 5 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -174,9 +174,12 @@ To get the details of each robot, run the following API call:
174174

175175
| Purpose | Reason | Preventive instructions | Impact | Estimated duration | Frequency |
176176
|---------|--------|-------------------------|--------|--------------------|-----------|
177-
| Update of Zerto virtual machines (Zerto Virtual Manager, VRA) to the latest version offered by OVHcloud. | Zerto lifecycle of OVHcloud. | None | The Zerto console is unavailable\* during the maintenance. During that period of time, all the related zerto operations can't be performed (failover, VPG management, etc.).<br><br> - VRA is redeployed so that replication is interrupted and the RPO increases momentarily. | 01H30 | Based on the publisher lifecycle |
177+
| Update or migrate Zerto virtual machines (Zerto Virtual Manager, VRA) to the latest version offered by OVHcloud. | Zerto lifecycle management by OVHcloud. | A **health check report** may be sent if issues are detected before the maintenance, requiring resolution before it can proceed. | - **Upgrades**: Minimal impact, temporary unavailability of replication and failover.<br>- **Migrations**: Full service downtime, requiring reinstallation on a new platform. | **Upgrades**: ~1h per instance.<br>**Migrations**: Up to 12h per instance. | Based on the publisher lifecycle |
178178

179-
\*: see explanations below.
179+
> [!primary]
180+
> **Difference between upgrades and migrations:**
181+
> - **Upgrades** involve updating existing Zerto components (e.g., Zerto 10u6 to 10u7) with minimal service disruption (~1 hour).
182+
> - **Migrations** involve transitioning to a new platform (e.g., from Windows-based Zerto to appliance-based Zerto 10u6), resulting in up to 12 hours of complete downtime.
180183
181184
### Glossary
182185

0 commit comments

Comments
 (0)