Skip to content

Appimage

Appimage #15

Manually triggered July 1, 2025 23:41
Status Cancelled
Total duration 2m 11s
Artifacts

stable.yml

on: workflow_dispatch
Matrix: build
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Azahar build (Normal) (x86_64)
The operation was canceled.
Azahar build (Normal) (x86_64)
Canceling since a higher priority waiting request for build-refs/heads/main exists
Azahar Build (Optimized) (x86_64)
The operation was canceled.
Azahar Build (Optimized) (x86_64)
Canceling since a higher priority waiting request for build-refs/heads/main exists
Azahar build (aarch64)
Canceling since a higher priority waiting request for build-refs/heads/main exists
Appimage
Canceling since a higher priority waiting request for build-refs/heads/main exists