Skip to content

Merge pull request #135 from python-ellar/dependabot/pip/ruff-0.11.7 #563

Merge pull request #135 from python-ellar/dependabot/pip/ruff-0.11.7

Merge pull request #135 from python-ellar/dependabot/pip/ruff-0.11.7 #563

Triggered via push October 4, 2025 06:08
Status Failure
Total duration 31s
Artifacts

test_full.yml

on: push
codestyle
16s
codestyle
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test (3.8)
Process completed with exit code 2.
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_8" failed
codestyle
Process completed with exit code 2.
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_8" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_8" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_8" failed