Skip to content

Merge pull request #138 from python-ellar/mypy_fix_3oct #567

Merge pull request #138 from python-ellar/mypy_fix_3oct

Merge pull request #138 from python-ellar/mypy_fix_3oct #567

Triggered via push October 4, 2025 06:15
Status Failure
Total duration 27s
Artifacts

test_full.yml

on: push
codestyle
17s
codestyle
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
codestyle
Process completed with exit code 2.
test (3.8)
Process completed with exit code 2.
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_8" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_8" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_8" failed
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_8" failed