CI: test Docker v28 in addition to v27 #977
Triggered via pull request
February 20, 2025 06:11
Status
Failure
Total duration
19m 38s
Artifacts
–
main.yaml
on: pull_request
Unit test
1m 10s
Cross compilation test
1m 34s
Integration test
19m 26s
Matrix: Integration test (Docker)
Annotations
3 errors
|
Integration test (Docker) (28.0.0)
Process completed with exit code 125.
|
|
Integration test (Docker) (27.5.1)
The job was canceled because "_28_0_0" failed.
|
|
Integration test (Docker) (27.5.1)
The operation was canceled.
|