Update dependency: deps/pyproject-build-systems #275
Triggered via pull request
December 14, 2025 12:10
Status
Cancelled
Total duration
2m 19s
Artifacts
–
test-pr.yml
on: pull_request
Code Quality Checks & Unit Tests
23s
Integration Tests
2m 16s
Docker Tests
1m 22s
Matrix: Nix Tests
Annotations
10 errors
|
Nix Tests (normal)
Canceling since a higher priority waiting request for Test PR-refs/pull/62/merge exists
|
|
Nix Tests (normal)
The operation was canceled.
|
|
Nix Tests (MacM1)
Canceling since a higher priority waiting request for Test PR-refs/pull/62/merge exists
|
|
Nix Tests (MacM1)
The operation was canceled.
|
|
Docker Tests
Canceling since a higher priority waiting request for Test PR-refs/pull/62/merge exists
|
|
Docker Tests
The operation was canceled.
|
|
Integration Tests
Canceling since a higher priority waiting request for Test PR-refs/pull/62/merge exists
|
|
Integration Tests
Process completed with exit code 1.
|
|
Integration Tests
The operation was canceled.
|
|
Test PR
Canceling since a higher priority waiting request for Test PR-refs/pull/62/merge exists
|