Skip to content

Continuous integration #834

Continuous integration

Continuous integration #834

Triggered via schedule January 18, 2026 18:34
Status Failure
Total duration 56s
Artifacts

rust.yml

on: schedule
Rustfmt
8s
Rustfmt
Clippy
15s
Clippy
Build documentation
19s
Build documentation
Check semver compatibility
20s
Check semver compatibility
Validate external types appearing in public API
52s
Validate external types appearing in public API
Matrix: Check
Matrix: Test Suite
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Clippy
Process completed with exit code 101.
Check (nightly)
Process completed with exit code 101.
Check (1.65.0)
The strategy configuration was canceled because "check.nightly" failed
Check (1.65.0)
The operation was canceled.
Test Suite (--no-default-features)
Process completed with exit code 101.
Test Suite (--features=default)
The strategy configuration was canceled because "test._--no-default-features" failed
Test Suite (--features=default)
Process completed with exit code 101.
Test Suite (--all-features)
The strategy configuration was canceled because "test._--no-default-features" failed
Test Suite (--all-features)
The operation was canceled.
Validate external types appearing in public API
Process completed with exit code 2.