Skip to content

Update pekko-stream to 1.4.0 #411

Update pekko-stream to 1.4.0

Update pekko-stream to 1.4.0 #411

Triggered via push December 12, 2025 15:13
Status Failure
Total duration 3m 34s
Artifacts

ci.yml

on: push
Matrix: Build and Test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Build and Test (ubuntu-latest, 2.11.12, temurin@11)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 2.12.20, temurin@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_tem" failed
Build and Test (ubuntu-latest, 2.12.20, temurin@11)
The operation was canceled.
Build and Test (ubuntu-latest, 3.7.4, temurin@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_tem" failed
Build and Test (ubuntu-latest, 3.7.4, temurin@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.11.12, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_tem" failed
Build and Test (ubuntu-latest, 2.11.12, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.18, temurin@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_tem" failed
Build and Test (ubuntu-latest, 2.13.18, temurin@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.20, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_tem" failed
Build and Test (ubuntu-latest, 2.12.20, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.18, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_tem" failed
Build and Test (ubuntu-latest, 2.13.18, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 3.7.4, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_11_12_tem" failed
Build and Test (ubuntu-latest, 3.7.4, temurin@17)
The operation was canceled.