chore(pre-commit): update crate-ci/typos to v1.35.1 #2919
ci.yaml
on: pull_request
pre-commit
2m 18s
Matrix: distcheck
Annotations
12 errors
|
pre-commit
Process completed with exit code 1.
|
|
distcheck (fedoradev)
Process completed with exit code 2.
|
|
distcheck (alpine)
The operation was canceled.
|
|
distcheck (alpine)
The strategy configuration was canceled because "distcheck.fedoradev" failed
|
|
distcheck (centos7)
The operation was canceled.
|
|
distcheck (centos7)
The strategy configuration was canceled because "distcheck.fedoradev" failed
|
|
distcheck (debian10, true, none)
The operation was canceled.
|
|
distcheck (debian10, true, none)
The strategy configuration was canceled because "distcheck.fedoradev" failed
|
|
distcheck (debian10)
The operation was canceled.
|
|
distcheck (debian10)
The strategy configuration was canceled because "distcheck.fedoradev" failed
|
|
distcheck (ubuntu14)
The operation was canceled.
|
|
distcheck (ubuntu14)
The strategy configuration was canceled because "distcheck.fedoradev" failed
|