Skip to content

Preparing for release, 2.2.0. #150

Preparing for release, 2.2.0.

Preparing for release, 2.2.0. #150

Triggered via push September 22, 2025 13:11
Status Failure
Total duration 2m 43s
Artifacts
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (ruby=3.4, postgresql=16, active_record=~> 8.0.2)
The process '/usr/bin/xvfb-run' failed with exit code 17
test (ruby=3.4, postgresql=15, active_record=~> 8.0.2)
The operation was canceled.
test (ruby=3.4, postgresql=15, active_record=~> 8.0.2)
The strategy configuration was canceled because "test._3_4_16____8_0_2" failed
test (ruby=3.2, postgresql=11, active_record=~> 6.0.0)
The operation was canceled.
test (ruby=3.2, postgresql=11, active_record=~> 6.0.0)
The strategy configuration was canceled because "test._3_4_16____8_0_2" failed
test (ruby=3.3, postgresql=14, active_record=~> 7.2.0)
The operation was canceled.
test (ruby=3.3, postgresql=14, active_record=~> 7.2.0)
The strategy configuration was canceled because "test._3_4_16____8_0_2" failed