chore(deps): update cheroot requirement from <11 to <12 #1327
Triggered via pull request
October 1, 2025 22:06
Status
Cancelled
Total duration
10m 23s
Artifacts
–
tests.yml
on: pull_request
Matrix: build
Regression notifications
0s
Annotations
11 errors
|
build (3.13)
Event loop is closed
|
|
build (3.12)
The operation was canceled.
|
|
build (3.12)
The job has exceeded the maximum execution time of 10m0s
|
|
build (3.11)
The operation was canceled.
|
|
build (3.11)
The job has exceeded the maximum execution time of 10m0s
|
|
build (3.9)
The operation was canceled.
|
|
build (3.9)
The job has exceeded the maximum execution time of 10m0s
|
|
build (3.8)
The operation was canceled.
|
|
build (3.8)
The job has exceeded the maximum execution time of 10m0s
|
|
build (3.10)
The operation was canceled.
|
|
build (3.10)
The job has exceeded the maximum execution time of 10m0s
|