Document ATB PPA reference, typical levered returns
1 parent 4d7ac2f commit 20a99a7

File tree

2 files changed

+3
-2
lines changed

2 files changed

+3
-2
lines changed

docs/Fervo_Project_Cape-4.md

Lines changed: 2 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -19,7 +19,7 @@ comparison of results with reference values.
1919
| Maximum Drawdown | 0.009 | Tuned to keep minimum net electricity generation ≥ 500 MWe and number of times redrilling = 1 |
2020
| Reservoir Impedance | 0.001 GPa.s/m³ | |
2121
| Inflation Rate | 2.3% | US inflation rate as of April 2025 |
22-
| PPA Price | Starting at 9.5 cents/kWh, escalating to 10 cents/kWh by project year 11 | Both PPAs 'firm for 10 years at less than $100/MWh' estimate given in a podcast |
22+
| PPA Price | Starting at 9.5 cents/kWh, escalating to 10 cents/kWh by project year 11 | Upper end of ranges given in https://atb.nrel.gov/electricity/2024/geothermal. Both PPAs 'firm for 10 years at less than $100/MWh' estimate given in a podcast. |
2323
| Well Drilling Cost Correlation | Vertical large baseline correlation | Akindipe, D. and Witter. E. 2025. "2025 Geothermal Drilling Cost Curves Update". https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2025/Akindipe.pdf?t=1740084555. |
2424
| Reservoir Stimulation Capital Cost Adjustment Factor | 2 | Estimated cost of ~$1.5M per well falls within typical range of $0.5–2M |
2525
| Discount Rate | 7.5% | Intended to be approximately equivalent to the 8% inflated equity interest rate used in the 400 MWe BICYCLE case study (Fervo_Project_Cape-3) |
@@ -37,4 +37,5 @@ comparison of results with reference values.
3737
| Minimum Net Electricity Generation | 502.72 MW | 500 MW | https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
3838
| Well Drilling and Completion Cost Correlation | $4.72M/well | $4.8M/well | https://houston.innovationmap.com/fervo-energy-drilling-utah-project-2667300142.html |
3939
| WACC | 8.3% | 8.3% | https://www.linkedin.com/pulse/fervo-energy-technology-day-2024-entering-geothermal-decade-matson-n4stc |
40+
| After-tax IRR | 18.28% | 15–25% | Typical levered returns for energy projects |
4041
| Number of times redrilling | 1 | 1–2 | Redrilling expected to be required within 5–10 years of project start |

tests/examples/Fervo_Project_Cape-4.txt

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -5,7 +5,7 @@
55
# *************************************
66
Economic Model, 5, -- SAM Single Owner PPA
77

8-
Starting Electricity Sale Price, 0.095, -- Both PPAs 'firm for 10 years at less than $100/MWh' estimate given in a podcast
8+
Starting Electricity Sale Price, 0.095, -- Upper end of ranges given in https://atb.nrel.gov/electricity/2024/geothermal. Both PPAs 'firm for 10 years at less than $100/MWh' estimate given in a podcast.
99
Ending Electricity Sale Price, 0.1
1010
Electricity Escalation Rate Per Year, 0.00057
1111
Electricity Escalation Start Year, 1