- "description": "Select the built-in well drilling and completion cost correlation: 1: vertical small diameter, baseline; 2: deviated small diameter, baseline; 3: vertical large diameter, baseline; 4: deviated large diameter, baseline; 5: Simple (per-meter cost); 6: vertical small diameter, intermediate1; 7: vertical small diameter, intermediate2; 8: deviated small diameter, intermediate1; 9: deviated small diameter, intermediate2; 10: vertical large diameter, intermediate1; 11: vertical large diameter, intermediate2; 12: deviated large diameter, intermediate1; 13: deviated large diameter, intermediate2; 14: vertical open-hole, small diameter, ideal; 15: deviated liner, small diameter, ideal; 16: vertical open-hole, large diameter, ideal; 17: deviated liner, large diameter, ideal. Baseline correlations (1-4) are from NREL's 2025 cost curve update. Intermediate and ideal correlations (6-17) are from GeoVision.",
0 commit comments