Remove example instances of setting FIR solely to match with DR, since this is now done automatically
1 parent 619fd5f commit 37fdfe7

File tree

5 files changed

+0
-5
lines changed

5 files changed

+0
-5
lines changed

tests/examples/example10_HP.txt

Lines changed: 0 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -51,7 +51,6 @@ Heat Pump COP, 2.8, --- [-]
5151
Plant Lifetime,30, ---[years]
5252
Economic Model,2, ---BICYCLE Levelized Cost Model
5353
Discount Rate, 0.05, --- [-] Required if Standard LCOE/LCOH model is selected. See manual for details.
54-
Fixed Internal Rate, 5, -- matches Discount Rate
5554
Inflation Rate During Construction,0.05, ---[-]
5655

5756
# ***Capital and O&M Cost Parameters***

tests/examples/example11_AC.txt

Lines changed: 0 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -46,7 +46,6 @@ Absorption Chiller COP, 0.72, --- [-]
4646
Plant Lifetime,30, ---[years]
4747
Economic Model,2, ---BICYCLE Levelized Cost Model
4848
Discount Rate, 0.05, --- [-] Required if Standard LCOE/LCOH model is selected. See manual for details.
49-
Fixed Internal Rate, 5, -- matches Discount Rate
5049
Inflation Rate During Construction,0.05, ---[-]
5150

5251
# ***Capital and O&M Cost Parameters***

tests/examples/example13.txt

Lines changed: 0 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -53,7 +53,6 @@ District Heating Road Length,3, ---[km] supersedes model option 2 if any val
5353
Plant Lifetime,30, --- [years]
5454
Economic Model,2, --- Should be 1 (FCR model), 2 (Standard LCOE/LCOH model), or 3 (Bicycle model).
5555
Discount Rate,0.05,
56-
Fixed Internal Rate,5, -- matches Discount Rate
5756
Inflation Rate During Construction,0, --- [-]
5857
Well Drilling and Completion Capital Cost Adjustment Factor,1, --- [-] Use built-in well cost correlation as is
5958
Well Drilling Cost Correlation,1, --- [-] Use built-in well drilling cost correlation #1

tests/examples/example2.txt

Lines changed: 0 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -43,7 +43,6 @@ Surface Temperature,15, ---[deg.C]
4343
Plant Lifetime,25, ---[years]
4444
Economic Model,2, ---Standard Levelized Cost Model
4545
Discount Rate,.05, ---[-]
46-
Fixed Internal Rate,5, -- matches Discount Rate
4746
Inflation Rate During Construction,0, ---[-]
4847

4948
# ***Capital and O&M Cost Parameters***

tests/examples/example_SHR-2.txt

Lines changed: 0 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -47,7 +47,6 @@ Tax Relief Per Year, 2.212
4747
Do Carbon Price Calculations, True
4848
Time steps per year, 6
4949
Discount Rate, 0.06
50-
Fixed Internal Rate, 6, -- matches Discount Rate
5150
Reservoir Stimulation Capital Cost, 18
5251
Well Drilling and Completion Capital Cost Adjustment Factor, 2
5352
Injection Well Drilling and Completion Capital Cost Adjustment Factor, 2