@@ -8,7 +8,7 @@ Financial results are calculated
88
using
99
the [SAM Single Owner PPA Economic Model](https://softwareengineerprogrammer.github.io/GEOPHIRES/SAM-Economic-Models.html#sam-single-owner-ppa).
1010

11-
Key case study results include LCOE = $78.8/MWh and CAPEX = $4650/kW.
11+
Key case study results include LCOE = $76.5/MWh and CAPEX = $4350/kW.
1212

1313
[Click here](https://gtp.scientificwebservices.com/geophires/?geophires-example-id=Fervo_Project_Cape-4) to
1414
interactively explore the case study in the GEOPHIRES web interface.
@@ -82,12 +82,12 @@ in source code for the complete results.
8282

8383
| Metric | Result Value | Reference Value(s) | Reference Source |
8484
|------------------------------------|----------------------------------------------------------|--------------------------|---------------------------------------------|
85-
| LCOE | $78.8/MWh | $80/MWh | Horne et al, 2025 |
86-
| Project capital costs: Total CAPEX | $2.86B | | |
87-
| Project capital costs: $/kW | $4650/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne et al, 2025; Latimer, 2025. |
85+
| LCOE | $76.5/MWh | $80/MWh | Horne et al, 2025 |
86+
| Project capital costs: Total CAPEX | $2.67B | | |
87+
| Project capital costs: $/kW | $4350/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne et al, 2025; Latimer, 2025. |
8888
| Well Drilling and Completion Cost | $3.96M/well | $<4M/well | Latimer, 2025. |
8989
| WACC | 8.3% | 8.3% | Matson, 2024. |
90-
| After-tax IRR | 28% | 15–25% | Typical levered returns for energy projects |
90+
| After-tax IRR | 30.7% | 15–25% | Typical levered returns for energy projects |
9191

9292
### Technical & Engineering Results