| Project capital costs: $/kW | $4650/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne et al, 2025; Latimer, 2025. |
| Project capital costs: $/kW | $4350/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne et al, 2025; Latimer, 2025. |
88
88
| Well Drilling and Completion Cost | $3.96M/well | $<4M/well | Latimer, 2025. |
89
89
| WACC | 8.3% | 8.3% | Matson, 2024. |
90
-
| After-tax IRR |28% | 15–25% | Typical levered returns for energy projects |
90
+
| After-tax IRR |30.7%| 15–25% | Typical levered returns for energy projects |