Browse files
Updated Fervo 400 MWe estimates
1 parent 3004ad0 commit 5d38eec

File tree

1 file changed

+8
-15
lines changed

1 file changed

+8
-15
lines changed
Lines changed: 8 additions & 15 deletions
Original file line numberDiff line numberDiff line change
@@ -1,10 +1,8 @@
11
# Case Study: Fervo Project Cape 3: Extrapolation from Fervo results pre-published 2024-09-10 at
22
# https://eartharxiv.org/repository/view/7665/ to 400MWe capacity.
3-
# Norbeck J., Gradl C., and Latimer T. 2024.
3+
# Norbeck J., -- Gradl C., and Latimer T. 2024.
44
# "Deployment of Enhanced Geothermal System technology leads to rapid cost reductions and performance improvements."
55
# https://doi.org/10.31223/X5VH8C
6-
7-
86
Reservoir Model, 1
97
Reservoir Volume Option, 1
108
Reservoir Density, 2800
@@ -13,16 +11,13 @@ Reservoir Heat Capacity, 790
1311
Reservoir Thermal Conductivity, 3.05
1412
Reservoir Porosity, 0.0118
1513
Reservoir Impedance, 0.001
16-
1714
Number of Fractures, 149
1815
Fracture Shape, 4
1916
Fracture Height, 2000
2017
Fracture Width, 10000
2118
Fracture Separation, 30
22-
2319
Number of Segments, 1
2420
Gradient 1, 74, -- temperature at 8500 ft: 200 degC (https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2024/Fercho.pdf); 228.89 degC @ 9824 ft (https://doi.org/10.31223/X5VH8C)
25-
2621
Number of Injection Wells, 39
2722
Number of Production Wells, 39
2823
Production Flow Rate per Well, 120, -- peak flow reported in paper
@@ -40,13 +35,12 @@ Maximum Drawdown, 1
4035
Ambient Temperature, 10 degC
4136
Surface Temperature, 10 degC
4237
End-Use Option, 1
43-
Plant Lifetime, 15
38+
Plant Lifetime, 20
4439
Power Plant Type, 2
4540
Circulation Pump Efficiency, 0.80
46-
47-
Exploration Capital Cost, 0
48-
Well Drilling and Completion Capital Cost, 4, -- Assume cost continues to decrease from 4.8 (https://houston.innovationmap.com/fervo-energy-drilling-utah-project-2667300142.html)
49-
Reservoir Stimulation Capital Cost, 78, -- $1M/well estimated
41+
Exploration Capital Cost, 30
42+
Well Drilling and Completion Capital Cost, 5.84, -- $3.84M/well + $2M/well additional stimulation cost
43+
Reservoir Stimulation Capital Cost, 78, -- $3M/well - $1M as stimulation + $2M represented in well drilling cost
5044
Economic Model, 3
5145
Starting Electricity Sale Price, 0.15
5246
Ending Electricity Sale Price, 1.00
@@ -58,15 +52,14 @@ Gross Revenue Tax Rate, 0
5852
Inflated Bond Interest Rate, .05
5953
Inflated Equity Interest Rate, .08
6054
Inflation Rate, .02
61-
Investment Tax Credit Rate, 0
55+
Investment Tax Credit Rate, .3
6256
Inflation Rate During Construction, 0.05
6357
Property Tax Rate, 0
6458
Time steps per year, 10
6559
Maximum Temperature, 500
66-
Surface Plant Capital Cost Adjustment Factor, 0.78, -- pad drilling reduces surface CAPEX by 22% https://www.resfrac.com/blog/digesting-the-bonkers-incredible-off-the-charts-spectacular-results-from-the-fervo-and-forge-enhanced-geothermal-projects
67-
60+
Surface Plant Capital Cost Adjustment Factor, 0.71, -- $1900/kW (peak production)
6861
Well Geometry Configuration, 4
6962
Has Nonvertical Section, True
7063
Multilaterals Cased, True
7164
Number of Multilateral Sections, 3
72-
Nonvertical Length per Multilateral Section, 4700 feet
65+
Nonvertical Length per Multilateral Section, 7500 feet