Set Number of Multilateral Sections = 0 with comment explaining how vertical and horizontal costs are lumped for better result clarity. TODO to investigate using a deviated drilling correlation to possibly 'better' represent costs
| Project capital costs: $/kW | $4350/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne et al, 2025; Latimer, 2025. |
88
-
| Well Drilling and Completion Cost | $3.96M/well | $<4M/well | Latimer, 2025. |
87
+
| Project capital costs: $/kW | $4340/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne et al, 2025; Latimer, 2025. |
88
+
| Well Drilling and Completion Cost | $3.96M/well (before 5% indirect costs)| $<4M/well | Latimer, 2025. |
89
89
| WACC | 8.3% | 8.3% | Matson, 2024. |
90
-
| After-tax IRR | 30.7% | 15–25% | Typical levered returns for energy projects |
90
+
| After-tax IRR | 30.8% | 15–25% | Typical levered returns for energy projects |
91
91
92
92
### Technical & Engineering Results
93
93
94
94
| Metric | Result Value | Reference Value(s) | Reference Source |
| Minimum Net Electricity Generation | 503 MW | 500 MW | Fervo Energy, 2025. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
97
-
| Maximum Total Electricity Generation |615 MW || Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
97
+
| Maximum Total Electricity Generation |614 MW || Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
98
98
| Number of times redrilling | 3 | 3–6 | Redrilling expected to be required within 5–10 years of project start |
99
99
| Average Production Temperature | 199℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) | Trent, 2024; Norbeck et al, 2024. |
100
100
| Total fracture surface area per production well | 2.787×10⁶ m² | 2.787×10⁶ m² (30 million ft² per well) | Fercho et al, 2025. |