docs/Fervo_Project_Cape-4.md

Lines changed: 11 additions & 11 deletions
Original file line numberDiff line numberDiff line change
@@ -56,17 +56,17 @@ in source code for the full set of inputs.
5656

5757
## Results
5858

59-
| Metric | Result Value | Reference Value(s) | Reference Source |
60-
|-----------------------------------------------|-----------------------------------------------------------|----------------------------------------------------|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
61-
| LCOE | $81.6/MWh | $80/MWh | https://www.nature.com/articles/s44359-024-00019-9 |
62-
| Project capital costs | ~$4500/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | https://www.nature.com/articles/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
63-
| Maximum Total Electricity Generation | 615 MW | | Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
64-
| Minimum Net Electricity Generation | 500 MW | 500 MW | https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
65-
| Average Production Temperature | 198.9℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) | https://jpt.spe.org/fervo-and-forge-report-breakthrough-test-results-signaling-more-progress-for-enhanced-geothermal; https://eartharxiv.org/repository/view/7665/. |
66-
| Well Drilling and Completion Cost Correlation | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal |
67-
| WACC | 8.3% | 8.3% | https://www.linkedin.com/pulse/fervo-energy-technology-day-2024-entering-geothermal-decade-matson-n4stc |
68-
| After-tax IRR | 25.85% | 15–25% | Typical levered returns for energy projects |
69-
| Number of times redrilling | 2 | 1–4 | Redrilling expected to be required within 5–10 years of project start |
59+
| Metric | Result Value | Reference Value(s) | Reference Source |
60+
|-----------------------------------------------|-----------------------------------------------------------|----------------------------------------------------|----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
61+
| LCOE | $81.6/MWh | $80/MWh | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9 |
62+
| Project capital costs | ~$4500/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
63+
| Maximum Total Electricity Generation | 615 MW | | Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
64+
| Minimum Net Electricity Generation | 500 MW | 500 MW | https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
65+
| Average Production Temperature | 198.9℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) | https://jpt.spe.org/fervo-and-forge-report-breakthrough-test-results-signaling-more-progress-for-enhanced-geothermal; https://eartharxiv.org/repository/view/7665/. |
66+
| Well Drilling and Completion Cost Correlation | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal |
67+
| WACC | 8.3% | 8.3% | https://www.linkedin.com/pulse/fervo-energy-technology-day-2024-entering-geothermal-decade-matson-n4stc |
68+
| After-tax IRR | 25.85% | 15–25% | Typical levered returns for energy projects |
69+
| Number of times redrilling | 2 | 1–4 | Redrilling expected to be required within 5–10 years of project start |
7070

7171
See [Fervo_Project_Cape-4.out](https://github.com/softwareengineerprogrammer/GEOPHIRES/blob/main/tests/examples/Fervo_Project_Cape-4.out)
7272