@@ -22,6 +22,7 @@ The following table describes how GEOPHIRES parameters are transformed into SAM
22
22
|`Net Electricity Generation`| AC Degradation |`Annual AC degradation rate` schedule |`Utilityrate5`|`degradation`| Percentage difference of each year's `Net Electricity Generation` from `Maximum Total Electricity Generation` is input as SAM as the degradation rate schedule in order to match SAM's generation profile to GEOPHIRES |
23
23
| {`Total CAPEX` before inflation} × (1 + `Accrued financing during construction (%)`/100); | Installation Costs |`Total Installed Cost`|`Singleowner`|`total_installed_cost`|`Accrued financing during construction (%)` = (1+`Inflation Rate During Construction`) × 100 if `Inflation Rate During Construction` is provided or ((1+`Inflation Rate`) ^ `Construction Years`) × 100 if not. |
|`Royalty Rate`| Operating Costs |`Variable operating cost`|`Singleowner`|`om_production`| Royalties are treated as a variable operating cost to the owner |