@@ -114,8 +114,8 @@ The following heatmaps visualize Electricity breakeven price (LCOE) and NPV sens
114114
Stimulation costs were tested from $2.3M/well (Reservoir Stimulation Capital Cost Adjustment Factor = 0.5) to $9.2M/well (Reservoir Stimulation Capital Cost Adjustment Factor = 2).
115115
Construction inflation costs were tested from $53.58M (Inflation Rate During Construction = 2.3%) to $340.13M (Inflation Rate During Construction = 14.6%).
116116

117-
![](_images/fervo_project_cape-4_stim-infl-lcoe-heatmap_2025-08-13.png)
118-
![](_images/fervo_project_cape-4_stim-infl-npv-heatmap_2025-08-13.png)
117+
<img src="_images/fervo_project_cape-4_stim-infl-lcoe-heatmap_2025-08-13.png" style="width:75%;"/>
118+
<img src="_images/fervo_project_cape-4_stim-infl-npv-heatmap_2025-08-13.png" style="width:75%;"/>