@@ -114,8 +114,8 @@ The following heatmaps visualize Electricity breakeven price (LCOE) and NPV sens
114
114
Stimulation costs were tested from $2.3M/well (Reservoir Stimulation Capital Cost Adjustment Factor = 0.5) to $9.2M/well (Reservoir Stimulation Capital Cost Adjustment Factor = 2).
115
115
Construction inflation costs were tested from $53.58M (Inflation Rate During Construction = 2.3%) to $340.13M (Inflation Rate During Construction = 14.6%).