You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: docs/Fervo_Project_Cape-4.md
+12-10Lines changed: 12 additions & 10 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -41,7 +41,7 @@ the [web interface](https://gtp.scientificwebservices.com/geophires/?geophires-e
41
41
| Reservoir Impedance | 0.001 GPa.s/m³ | Same as 400 MWe case study (Fervo_Project_Cape-3) |
42
42
| Inflation Rate | 2.3% | US inflation rate as of April 2025 |
43
43
| PPA Price | Starting at 9.5 cents/kWh, escalating to 10 cents/kWh by project year 11 | Upper end of ranges given in https://atb.nrel.gov/electricity/2024/geothermal. Both PPAs 'firm for 10 years at less than $100/MWh' estimate given in a podcast. |
44
-
| Well Drilling Cost Correlation & Adjustment Factor | Vertical large baseline correlation + adjustment factor = 0.84 to align with Fervo claimed drilling costs of <$4M/well | Akindipe, D. and Witter. E. 2025. "2025 Geothermal Drilling Cost Curves Update". https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2025/Akindipe.pdf?t=1740084555. Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal.|
44
+
| Well Drilling Cost Correlation & Adjustment Factor | Vertical large baseline correlation + adjustment factor = 0.84 to align with Fervo claimed drilling costs of <$4M/well | Akindipe, D. and Witter. E. 2025. "2025 Geothermal Drilling Cost Curves Update". https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2025/Akindipe.pdf?t=1740084555; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal.|
45
45
| Reservoir Stimulation Capital Cost Adjustment Factor | 2 | Estimated cost of ~$1.5M per well falls within typical range of $0.5–2M |
46
46
| Capital Cost for Power Plant for Electricity Generation | $1900/kW |https://betterbuildingssolutioncenter.energy.gov/sites/default/files/attachments/Waste_Heat_to_Power_Fact_Sheet.pdf|
47
47
| Discount Rate | 7.5% | Intended to be approximately equivalent to the 8% inflated equity interest rate used in the 400 MWe BICYCLE case study ([Fervo_Project_Cape-3](https://gtp.scientificwebservices.com/geophires/?geophires-example-id=Fervo_Project_Cape-3)) |
@@ -54,14 +54,16 @@ See `tests/examples/Fervo_Project_Cape-4.txt` in source code for the full set of
54
54
55
55
## Results
56
56
57
-
| Metric | Result Value | Reference Value | Reference Source |
| Project capital costs | $4209/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW |https://www.nature.com/articles/s44359-024-00019-9. Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal.|
61
-
| Minimum Net Electricity Generation | 504.82 MW | 500 MW |https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
62
-
| Well Drilling and Completion Cost Correlation | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal|
| Project capital costs |~$4200/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW |https://www.nature.com/articles/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal.|
61
+
| Maximum Total Electricity Generation | 564 MW || Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 550 MW. |
62
+
| Minimum Net Electricity Generation | 505 MW | 500 MW |https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
63
+
| Average Production Temperature | 200℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) |https://jpt.spe.org/fervo-and-forge-report-breakthrough-test-results-signaling-more-progress-for-enhanced-geothermal; https://eartharxiv.org/repository/view/7665/.|
64
+
| Well Drilling and Completion Cost Correlation | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal|
0 commit comments