docs/Fervo_Project_Cape-4.md

Lines changed: 12 additions & 10 deletions
Original file line numberDiff line numberDiff line change
@@ -41,7 +41,7 @@ the [web interface](https://gtp.scientificwebservices.com/geophires/?geophires-e
4141
| Reservoir Impedance | 0.001 GPa.s/m³ | Same as 400 MWe case study (Fervo_Project_Cape-3) |
4242
| Inflation Rate | 2.3% | US inflation rate as of April 2025 |
4343
| PPA Price | Starting at 9.5 cents/kWh, escalating to 10 cents/kWh by project year 11 | Upper end of ranges given in https://atb.nrel.gov/electricity/2024/geothermal. Both PPAs 'firm for 10 years at less than $100/MWh' estimate given in a podcast. |
44-
| Well Drilling Cost Correlation & Adjustment Factor | Vertical large baseline correlation + adjustment factor = 0.84 to align with Fervo claimed drilling costs of <$4M/well | Akindipe, D. and Witter. E. 2025. "2025 Geothermal Drilling Cost Curves Update". https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2025/Akindipe.pdf?t=1740084555. Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
44+
| Well Drilling Cost Correlation & Adjustment Factor | Vertical large baseline correlation + adjustment factor = 0.84 to align with Fervo claimed drilling costs of <$4M/well | Akindipe, D. and Witter. E. 2025. "2025 Geothermal Drilling Cost Curves Update". https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2025/Akindipe.pdf?t=1740084555; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
4545
| Reservoir Stimulation Capital Cost Adjustment Factor | 2 | Estimated cost of ~$1.5M per well falls within typical range of $0.5–2M |
4646
| Capital Cost for Power Plant for Electricity Generation | $1900/kW | https://betterbuildingssolutioncenter.energy.gov/sites/default/files/attachments/Waste_Heat_to_Power_Fact_Sheet.pdf |
4747
| Discount Rate | 7.5% | Intended to be approximately equivalent to the 8% inflated equity interest rate used in the 400 MWe BICYCLE case study ([Fervo_Project_Cape-3](https://gtp.scientificwebservices.com/geophires/?geophires-example-id=Fervo_Project_Cape-3)) |
@@ -54,14 +54,16 @@ See `tests/examples/Fervo_Project_Cape-4.txt` in source code for the full set of
5454

5555
## Results
5656

57-
| Metric | Result Value | Reference Value | Reference Source |
58-
|-----------------------------------------------|----------------------------------------------------------|--------------------------|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
59-
| LCOE | $73/MWh | $80/MWh | https://www.nature.com/articles/s44359-024-00019-9 |
60-
| Project capital costs | $4209/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | https://www.nature.com/articles/s44359-024-00019-9. Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
61-
| Minimum Net Electricity Generation | 504.82 MW | 500 MW | https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
62-
| Well Drilling and Completion Cost Correlation | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal |
63-
| WACC | 8.3% | 8.3% | https://www.linkedin.com/pulse/fervo-energy-technology-day-2024-entering-geothermal-decade-matson-n4stc |
64-
| After-tax IRR | 18.80% | 15–25% | Typical levered returns for energy projects |
65-
| Number of times redrilling | 1 | 1–2 | Redrilling expected to be required within 5–10 years of project start |
57+
| Metric | Result Value(s) | Reference Value | Reference Source |
58+
|-----------------------------------------------|-----------------------------------------------------------|----------------------------------------------------|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
59+
| LCOE | $73/MWh | $80/MWh | https://www.nature.com/articles/s44359-024-00019-9 |
60+
| Project capital costs | ~$4200/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | https://www.nature.com/articles/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
61+
| Maximum Total Electricity Generation | 564 MW | | Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 550 MW. |
62+
| Minimum Net Electricity Generation | 505 MW | 500 MW | https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
63+
| Average Production Temperature | 200℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) | https://jpt.spe.org/fervo-and-forge-report-breakthrough-test-results-signaling-more-progress-for-enhanced-geothermal; https://eartharxiv.org/repository/view/7665/. |
64+
| Well Drilling and Completion Cost Correlation | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal |
65+
| WACC | 8.3% | 8.3% | https://www.linkedin.com/pulse/fervo-energy-technology-day-2024-entering-geothermal-decade-matson-n4stc |
66+
| After-tax IRR | 18.80% | 15–25% | Typical levered returns for energy projects |
67+
| Number of times redrilling | 1 | 1–2 | Redrilling expected to be required within 5–10 years of project start |
6668

6769
See `tests/examples/Fervo_Project_Cape-4.out` in source code for the results.