Explicitly list Total CAPEX = $2.86B
1 parent 33ec1e0 commit b637555

File tree

1 file changed

+14
-12
lines changed

1 file changed

+14
-12
lines changed

docs/Fervo_Project_Cape-4.md

Lines changed: 14 additions & 12 deletions
Original file line numberDiff line numberDiff line change
@@ -61,17 +61,18 @@ in source code for the full set of inputs.
6161

6262
## Results
6363

64-
| Metric | Result Value | Reference Value(s) | Reference Source |
65-
|--------------------------------------|-----------------------------------------------------------|----------------------------------------------------|----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
66-
| LCOE | $79/MWh | $80/MWh | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9 |
67-
| Project capital costs | ~$4650/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
68-
| Maximum Total Electricity Generation | 615 MW | | Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
69-
| Minimum Net Electricity Generation | 500 MW | 500 MW | https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
70-
| Average Production Temperature | 199℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) | https://jpt.spe.org/fervo-and-forge-report-breakthrough-test-results-signaling-more-progress-for-enhanced-geothermal; https://eartharxiv.org/repository/view/7665/. |
71-
| Well Drilling and Completion Cost | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal |
72-
| WACC | 8.3% | 8.3% | https://www.linkedin.com/pulse/fervo-energy-technology-day-2024-entering-geothermal-decade-matson-n4stc |
73-
| After-tax IRR | 28.11% | 15–25% | Typical levered returns for energy projects |
74-
| Number of times redrilling | 3 | 3–6 | Redrilling expected to be required within 5–10 years of project start |
64+
| Metric | Result Value | Reference Value(s) | Reference Source |
65+
|--------------------------------------|----------------------------------------------------------|----------------------------------------------------|----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
66+
| LCOE | $79/MWh | $80/MWh | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9 |
67+
| Project capital costs: Total CAPEX | $2.86B | | |
68+
| Project capital costs: $/kW | $4650/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
69+
| Maximum Total Electricity Generation | 615 MW | | Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
70+
| Minimum Net Electricity Generation | 500 MW | 500 MW | https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
71+
| Average Production Temperature | 199℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) | https://jpt.spe.org/fervo-and-forge-report-breakthrough-test-results-signaling-more-progress-for-enhanced-geothermal; https://eartharxiv.org/repository/view/7665/. |
72+
| Well Drilling and Completion Cost | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal |
73+
| WACC | 8.3% | 8.3% | https://www.linkedin.com/pulse/fervo-energy-technology-day-2024-entering-geothermal-decade-matson-n4stc |
74+
| After-tax IRR | 28.11% | 15–25% | Typical levered returns for energy projects |
75+
| Number of times redrilling | 3 | 3–6 | Redrilling expected to be required within 5–10 years of project start |
7576

7677
See [Fervo_Project_Cape-4.out](https://github.com/softwareengineerprogrammer/GEOPHIRES/blob/main/tests/examples/Fervo_Project_Cape-4.out)
7778
in source code for the complete results.
@@ -81,5 +82,6 @@ in source code for the complete results.
8182
Given the methodological approach, including speculative estimation of some input parameters, and lack of real-world
8283
reference data for comparison, the case study results are subject to uncertainty. This case study does not attempt to
8384
quantify uncertainties, but sensitivity analysis may be included in future updates. Users may wish to perform their own
84-
sensitivity analysis using [GEOPHIRES's Monte Carlo simulation module](Monte-Carlo-User-Guide.html) or other data analysis
85+
sensitivity analysis using [GEOPHIRES's Monte Carlo simulation module](Monte-Carlo-User-Guide.html) or other data
86+
analysis
8587
tools.