@@ -50,11 +50,12 @@ the [web interface](https://gtp.scientificwebservices.com/geophires/?geophires-e
5050
| Exploration Capital Cost | $30M | Estimate significantly higher exploration costs than default correlation in consideration of potential risks associated with second/third/fourth-of-a-kind EGS projects |
5151
| Investment Tax Credit Rate (ITC) | 30% | Same as 400 MWe case study (Fervo_Project_Cape-3) |
5252

53-
See [Fervo_Project_Cape-4.txt](https://github.com/softwareengineerprogrammer/GEOPHIRES/blob/main/tests/examples/Fervo_Project_Cape-4.txt) in source code for the full set of inputs.
53+
See [Fervo_Project_Cape-4.txt](https://github.com/softwareengineerprogrammer/GEOPHIRES/blob/main/tests/examples/Fervo_Project_Cape-4.txt)
54+
in source code for the full set of inputs.
5455

5556
## Results
5657

57-
| Metric | Result Value(s) | Reference Value | Reference Source |
58+
| Metric | Result Value | Reference Value(s) | Reference Source |
5859
|-----------------------------------------------|-----------------------------------------------------------|----------------------------------------------------|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
5960
| LCOE | $73/MWh | $80/MWh | https://www.nature.com/articles/s44359-024-00019-9 |
6061
| Project capital costs | ~$4200/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | https://www.nature.com/articles/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal. |
@@ -66,4 +67,5 @@ See [Fervo_Project_Cape-4.txt](https://github.com/softwareengineerprogrammer/GEO
6667
| After-tax IRR | 18.80% | 15–25% | Typical levered returns for energy projects |
6768
| Number of times redrilling | 1 | 1–2 | Redrilling expected to be required within 5–10 years of project start |
6869

69-
See [Fervo_Project_Cape-4.out](https://github.com/softwareengineerprogrammer/GEOPHIRES/blob/main/tests/examples/Fervo_Project_Cape-4.out) in source code for the complete results.
70+
See [Fervo_Project_Cape-4.out](https://github.com/softwareengineerprogrammer/GEOPHIRES/blob/main/tests/examples/Fervo_Project_Cape-4.out)
71+
in source code for the complete results.