Skip to content

feat(chore):integration between lb4 applications and mcp #6

feat(chore):integration between lb4 applications and mcp

feat(chore):integration between lb4 applications and mcp #6

Re-run triggered November 24, 2025 11:50
Status Failure
Total duration 30s
Artifacts

main.yaml

on: pull_request
Matrix: node_matrix_tests
npm_test
0s
npm_test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
node_matrix_tests (22)
Process completed with exit code 1.
node_matrix_tests (20)
The strategy configuration was canceled because "node_matrix_tests._22" failed
node_matrix_tests (20)
The operation was canceled.
node_matrix_tests (24)
The strategy configuration was canceled because "node_matrix_tests._22" failed
node_matrix_tests (24)
The operation was canceled.