Skip to content

Commit 6eab579

Browse files
kk7dsgibizer
authored andcommitted
Bump nova-ceph-multstore timeout
The recent change(s) to enable a lot more SSHABLE checks puts the runtime of the ceph job really close to the 2h timeout even when things are working. Sometimes it times out before it finishes even though things are progressing. Bump the timeout to avoid that. Also bump us to 8G swap to match what is set on the parent ceph job when we upgraded to jammy. We could just unset this, but better to pin it high in case that job (defined elsewhere) changes. Our job is the largest ceph job, so it makes sense that it keeps its own swap level high. Change-Id: I6cefd87671614d87d92e4675fbc989fc9453c8b9 (cherry picked from commit 6ff3237)
1 parent efb0198 commit 6eab579

File tree

1 file changed

+2
-1
lines changed

1 file changed

+2
-1
lines changed

.zuul.yaml

Lines changed: 2 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -594,12 +594,13 @@
594594
irrelevant-files: *nova-base-irrelevant-files
595595
required-projects:
596596
- openstack/nova
597+
timeout: 9000
597598
pre-run:
598599
- playbooks/ceph/glance-setup.yaml
599600
vars:
600601
# NOTE(danms): Increase our swap size since we're dealing with
601602
# larger images and trigger OOMs.
602-
configure_swap_size: 4096
603+
configure_swap_size: 8192
603604
# NOTE(danms): These tests create an empty non-raw image, which nova
604605
# will refuse because we set never_download_image_if_on_rbd in this job.
605606
# Just skip these tests for this case.

0 commit comments

Comments
 (0)