You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: doc/source/contributor/package-updates.rst
+10-7Lines changed: 10 additions & 7 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -7,13 +7,13 @@ This section describes the Release Train process of creating new package reposit
7
7
Preparations
8
8
============
9
9
10
-
1. Before building images, you should check for any outstanding PRs into the earliest supported release. Below are the links for the Zed branches.
10
+
1. Before building images, you should check for any outstanding PRs into the earliest supported release. Below are the links for the 2023.1 (Antelope) branches.
.. NOTE(Alex-Welsh): These instructions are a fair bit out of date now. While
152
-
.. the structure is probably fine, it should reference the most recent release
151
+
152
+
.. warning::
153
+
154
+
This guide was written for the Wallaby release and has not been validated
155
+
for Antelope. Proceed with caution.
153
156
154
157
As this is not a full production system, only a reduced number of steps need to be followed to upgrade to a new release. Below describes these steps, with ``stackhpc/wallaby`` as the starting branch:
0 commit comments