Skip to content

Main

Main #819

Triggered via schedule January 3, 2026 08:05
Status Cancelled
Total duration 6h 0m 6s
Artifacts

main.yml

on: schedule
Release builds  /  Construct release build matrix
4s
Release builds / Construct release build matrix
Matrix: Unit tests / unit-tests
Matrix: Release builds / Release builds / execute-matrix
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Unit tests / Linux (nightly-main)
The job has exceeded the maximum execution time of 6h0m0s
Unit tests / Linux (nightly-main)
The operation was canceled.
Unit tests / Linux (5.10)
The job has exceeded the maximum execution time of 6h0m0s
Unit tests / Linux (5.10)
The operation was canceled.
Unit tests / Linux (6.0)
The job has exceeded the maximum execution time of 6h0m0s
Unit tests / Linux (6.0)
The operation was canceled.